Power System Study

Generator Interconnection Study

End-to-end study support for generator/BESS interconnection including power flow, short circuit, stability, and protection deliverables.

What is a Generator Interconnection Study?

A generator interconnection study package evaluates the system impacts of connecting generation or BESS at the POI. Typical scope includes load flow, short-circuit, stability, and protection-related deliverables based on utility/RTO requirements.

These studies ensure the proposed project can be safely and reliably interconnected without degrading system performance, violating equipment ratings, or creating stability risks. The scope depends on project size, POI voltage level, system strength, and utility-specific interconnection procedures.

Interconnection studies are required by utilities and ISOs/RTOs before project construction and energization. They inform upgrade costs, operational requirements, and interconnection agreements.

When This Study Is Required

New Generator/BESS Interconnection

Applications for PV, wind, BESS, or hybrid projects

Capacity or Control Changes

Upgrades in MW/MVA, equipment replacement, control modifications

Utility/RTO Study Process

Milestones and submissions per interconnection procedures

Resubmissions & Updates

Technical comments response and design changes

What eGridSync Delivers

Study scoping aligned to utility/RTO requirements

Data request checklist and model readiness assessment

Load flow impacts and mitigation recommendations

Short-circuit impacts (fault duty and equipment checks)

Stability analysis (where required)

Protection coordination and settings support (where required)

Utility-ready reporting package and responses to technical comments

Engineering support through interconnection approval

Inputs Required (Data Request Checklist)

Item Examples Why Required
POI detailsSubstation, breaker, voltage, interconnection configDefines interconnection point
Project dataMW/MVA, PF mode, controlsDrives impacts
ModelsNetwork + dynamic + inverter/controllerRequired for studies
EquipmentTransformer data, collector system, ratingsImpacts and constraints
Utility criteriaScreening/full study requirementsDefines deliverables
One-line diagramProject layout, POI connection detailsTopology understanding

Interconnection Study Process

1

Scope Definition & Data Request

Clarify utility requirements, identify needed data, establish timeline

2

Model Development & Validation

Build/validate base case, integrate project models, verify topology

3

Study Execution

Run required studies per scope (load flow, SC, stability, protection)

4

Impact Analysis & Mitigation

Identify violations, propose solutions, cost-effective alternatives

5

Report Delivery & Support

Utility-ready package, meeting attendance, technical Q&A, resubmissions

Common Issues Identified

Voltage or Thermal Violations

POI or nearby buses exceeding limits requiring upgrades or mitigation

Equipment Rating Exceedances

Breakers, transformers, or lines impacted requiring replacement or reconductoring

Stability or Control Concerns

System strength, damping, or ride-through issues requiring controls tuning

Incomplete or Incorrect Models

Missing data causing delays and requiring resubmission cycles

Frequently Asked Questions

What studies are typically included?

Usually power flow, short circuit, and sometimes stability and protection.

Can you handle utility comments?

Yes—technical clarifications and reruns if needed.

What's the biggest schedule risk?

Missing/incorrect models and incomplete POI data.

Can you support both PV and BESS?

Yes—control modes and limits must be clearly defined.

Do you provide a submission-ready report?

Yes—structured and utility-friendly.

How long does an interconnection study take?

Typically 4-8 weeks depending on scope, data availability, and utility queue position.

What if the utility requires revisions?

We support technical responses and reruns per utility comments.

Do you coordinate with the utility directly?

Yes, we can attend meetings and respond to technical questions.

What's included in the study cost?

Scope depends on utility requirements; we provide detailed cost breakdown upfront.

Can this support FERC/RTO queue processes?

Yes—studies can be tailored to ISO/RTO and utility-specific requirements.

Ready to Start Your Interconnection Study?

Contact eGridSync for comprehensive interconnection study support.